Description

  • It ensures water prevention by preventing the formation of fine cracks and gaps in the gypsum, leveling line and concrete after reacting with cement in the mortar thanks to the chemicals (water repellent) in its formula.
  • Thus, surfaces with high water retention are created by removing the wetting property of water molecules.
  • The lime you will use in gypsum works has no negative effect on Bepermo paint.
  • It improves the quality and strength by increasing the air formation in the new gypsum and concrete mortar.
  • It does not cause any change in the specified periods for laying natural Portland cement.